Give the vendor 45 minutes, two synthetic cases, one theatre, one shared team member, and one instrument set. Hand over the test pack only when the demonstration begins.
The clock prevents a polished tour from replacing evidence.
Takeaways
- Make every booking reserve a case, room, time, team, and required resources.
- Keep clinical readiness decisions with authorised professionals.
- Preserve changes, cancellations, substitutions, and acknowledgements.
- Reconcile theatre, stock, record, and billing events after downtime.
This is a software-evaluation script, not surgical, clinical, accreditation, legal, or procurement advice. The hospital’s authorised owners define clinical decisions and applicable standards.
Before minute zero: prepare the evidence pack
A theatre booking should not be a free-text calendar entry. Prepare two case requests, the permitted team and resources, one approved checklist version, a stock list, and an expected-results sheet. Do not include real patient information.
Tell the vendor what must be returned at the end: the final schedule, case histories, override evidence, checklist history, stock movements, handoff records, and downtime reconciliation. Clinical owners define the expected behaviour.
NIC’s e-Hospital module list includes operation theatre management among that platform’s modules. This confirms that OT can be a distinct hospital-system workstream. It does not set universal requirements or prove that another product contains the same functions.
Minutes 0 to 10: schedule the impossible list
Ask the vendor to move each synthetic case through a controlled state model:
CASE REQUEST
-> reviewed for scheduling
-> room, time, team, and resources assigned
-> required evidence recorded by authorised roles
-> case called / postponed / cancelled
-> in theatre
-> procedure complete
-> documentation, stock, billing, and destination handoffs
-> reconciled and closed
The system should expose who changed each state, when, why, and which earlier commitments were affected. Attempt to:
- book the same theatre for overlapping times;
- assign the same team member to two concurrent cases;
- reserve an instrument set already committed elsewhere;
- insert an emergency case into a full list;
- move a delayed case beyond the next booking.
At minute ten, capture the collision record. Mark each result as blocked, warned, displayed, or silently accepted. Ask which role can override each rule and whether the displaced case receives a new owner.
Minutes 10 to 20: withhold one readiness item
The WHO publishes a Surgical Safety Checklist and implementation material. NABH also publishes an operation-theatre checklist for its own programme context. The hospital’s qualified clinical and accreditation owners decide which current materials apply and how they are used.
Software should show approved checklist versions, assigned participants, timestamps, incomplete items, and permitted acknowledgements. It should not infer that a case is clinically safe because fields are populated. Withhold one synthetic item, record the authorised response, then add it under the correct role. Capture both states for the evidence pack.
Minutes 20 to 30: move one tray and two consumables
Use synthetic stock. Reserve an instrument tray and two consumables for a case. Replace one item before the case, open another during it, return one unused item, and quarantine the tray afterward. Trace each event to the authorised source and resulting stock state.
At minute 30, ask for the change history, user, time, reason, and reconciliation report. The CSSD software guide tests the sterile-supply lane separately. The theatre record should link to that lane without pretending the OT module validates reprocessing.
Minutes 30 to 40: change a fact after handoff
After a synthetic case closes, ask where the authorised procedure documentation goes, how the destination team sees status, how stock movements reach inventory, and how approved charge events reach billing. Change one record after the handoff. The receiving system should not silently retain an older fact.
Keep clinical notes and billing distinct. A charge line is not proof that a procedure occurred; a clinical note does not by itself authorize a price. Each system needs its own source and correction history. The evidence pack should show how the correction reached every affected queue.
Final five minutes: restore an interrupted list
Schedule two invented cases during downtime. Record the minimum approved information, change the order once, and restore the system. Re-enter or reconcile each event without losing the original time or creating duplicate cases. Then compare the theatre list, instrument state, consumables, documentation handoff, and billing queue.
Stop the timer when the vendor supplies the final evidence pack. Score correct state, collision handling, owner visibility, change evidence, full reconciliation, and whether every promised artifact was retrievable. Speed alone earns no point.
Patient Square does not publish a standalone operation-theatre module. Do not infer OT scheduling, surgical checklists, anaesthesia records, device links, inventory, or billing functions from Hospital Copilot. Use the hospital management system explainer to separate modules, then require the selected scope and acceptance test in writing.